Visual Structural Evaluation

Status: Assessment Completed — Planning & Bidding Underway

Overview

Our community’s reserve study recommended that the Association complete ancillary inspections, including a structural evaluation, to properly plan for the long-term integrity of our buildings.

To conduct this evaluation, the Board engaged Forensix Consulting—the engineering firm that previously completed property evaluations as part of our defect lawsuit and is intimately familiar with our structures. Their latest assessment report was officially received on July 2, 2026.

Financials & Timeline

ItemCost
Forensix Consulting Engineering Retainer $7,500.00
Site Inspection & Assessment Report Included
Total Engineering Investment $7,500.00

Report Date: July 2, 2026

Assessment Findings

On April 13, 2026, Forensix Consulting conducted an exterior walk-through of the property and accessed representative interior units across the community. Below is a summary of the primary findings categorized by building system:

Exterior Veneer & Windows

The report noted that previous window and balcony door replacements have successfully mitigated original as-built window leaks (observed interior moisture damage was historical/aged). However, several parapet drain scuppers are improperly sealed, causing dark water staining on the brick veneer below.

Roofs & Pop-Up Levels

Roof level Hardie siding panels show deterioration, exposed fasteners, and heavy reliance on remedial sealants. Several units exhibited staining on roof membranes consistent with standing water from improper slope to drain or elevated scupper flowlines.

Garage Lintels & Slabs (Good News)

While 30 select garage lintels were remediated during Phase 1 repairs, remaining lintels show isolated end-bearing brick failures, corrosion, and missing through-wall flashing. Importantly, garage slab cracks observed across representative units showed no vertical displacement—a positive finding confirming no evidence of active foundation failure.

Site Grading & Drainage

Portions of the community still exhibit flat or negative grading adjacent to building foundations. This improper slope allows surface water to pool near slabs and enter ground-floor wall cavities during heavy rains.

View Representative Field Observations & Evidence

To respect homeowner privacy, individual unit numbers have been omitted from this public summary. However, the engineer's community-wide recommendations were driven by the following representative conditions observed during interior and exterior inspections:

Historical Moisture Staining: Observed aged interior water damage at select second-floor window stools, baseboards, and stairwell landings—confirming where original window and door defects had previously leaked prior to our Phase 2 window and balcony door replacements.
Rooftop & Membrane Ponding: Identified staining and discoloration on rooftop decking and membranes consistent with standing water retention. In several areas, this was traced to inadequate drainage slope or improper through-parapet scupper flowline elevations.
Roof-Level Siding & Pop-Up Walls: Documented general weathering on roof-level siding panels, including deteriorated bottom edges, exposed corroded fasteners, and extensive reliance on remedial joint sealants—confirming the need for a comprehensive siding and weather-resistive barrier (WRB) replacement.
Surface Water Intrusion: Observed active or recent moisture intrusion at ground-floor entries and closets in select locations where exterior site grading is flat or sloped toward the building rather than away from the foundation.
Garage Slab Conditions (Normal Wear — No Structural Distress): Documented hairline slab cracks across garages, noting no vertical displacement across the fractures. In engineering terms, this is a positive finding—it indicates normal concrete curing and settlement over time with no evidence of active foundation movement or structural failure.
Garage Lintel Conditions: Noted isolated end-bearing brick masonry distress and surface corrosion on steel garage lintels that were not part of the initial Phase 1 lintel reinforcement project.
Balcony & Railing Enamel: Identified coating failure, surface oxidation, and corrosion on exterior iron railings and second-floor balcony frames, reinforcing the need for ongoing metalwork sealing and protective paint maintenance.

Assessment & Scope of Work

Below is an overview of the major items identified by our engineer in the assessment and how they are categorized moving forward. For deeper dives into our ongoing defect repair categories, visit Construction Defect Repairs.

Included in Phase 3 Defect Repairs

Community-Wide Parapet & Siding Reconstruction

This scope covers the community-wide parapet waterproofing plan defined by Charles Taylor Engineering Technical Services (CTETS). It includes selective demolition and structural rebuilding of parapet wall assemblies, replacement of all associated roof-level Hardie panel siding with code-compliant weather-resistive barriers (WRB) and flashings, installation of proper jamb and head flashings for all bulkhead doors, and replacement of vertical metal coping.

Bulkhead Door Waterproofing

3D engineering detail showing how proper weather-resistive barriers and metal head/jamb flashings will be integrated around all 88 rooftop and utility bulkhead doors.

Adding to Defects (Evaluating & Bidding)

Select 2nd-Floor Balconies

Although noted in the recent structural report, issues with select 2nd-floor balconies were discovered prior to that evaluation and Charles Taylor Engineering Technical Services (CTETS) has already completed their evaluation. Once the final drawings are received, we will need to schedule and fund those repairs.

Site Grading and Drainage

We are securing high-level bids for site grading and drainage from Reconstruction Experts (RE). Essential repairs are required to eliminate improper slope to drain and high grade elevations adjacent to buildings to prevent surface water intrusion.

Garage Lintels and Flashing

In Phase 1 of our defect repairs, 30 select garages were addressed based on engineering recommendations for thicker lintels, and the underlying flashing was repaired during that work. The engineer is recommending that the flashing and lintel bearing conditions on the remaining 33 garages be remediated. The scope of work for these remaining 33 garages is currently being evaluated for inclusion in a subsequent phase.

Sewer Cleanout Caps

We are evaluating cost-effective solutions for sewer cleanout cap replacements. Last year, 7 units were completed at ~$23K. Rather than an immediate full-property replacement, we are phasing this work over time—prioritizing assemblies that are beginning to fail so we can prevent full failures while securing better contract rates.

Owner Responsibilities

Roof Slope Membranes & Scuppers

While CTETS confirmed that our current water intrusion is not caused by membrane ponding, long-term standing water damages roof membranes over time. Because roof slope membranes are the unit owner's maintenance responsibility, Forensix Consulting recommends that owners inspect their membranes for ponding water and make necessary repairs (including slope adjustments or scupper elevation corrections).

Single-Unit Drain Scuppers & Downspouts

The structural assessment observed that several parapet drain scuppers connected to downspouts serving single units are not properly sealed. This allows water to spill over onto the building facade, as evidenced by dark staining on the brick veneer below the scuppers and behind the downspouts. Because these serve single units, remediation is an owner responsibility, and affected owners have been notified directly to make necessary repairs.

Recommendations & Action Plan

Forensix Consulting structured their engineering recommendations into prioritized timelines. Below is how these recommendations are categorized and where the Association stands on implementation:

Immediate & Short-Term (0 to 12 Months)

Site Grading & Drainage Remediation

Recommendation: Re-grade unpaved areas to a 5% slope away from buildings (2% at paved areas) and install drop inlets and underground drainage piping in trapped courtyard areas to prevent surface water intrusion.

Parapet Waterproofing & Scupper Sealing

Recommendation: Complete community-wide parapet cap replacement. Properly flash, seal, and borescope all parapet drain scuppers exhibiting dark veneer staining.

Garage Lintels & End-Bearing Brick

Recommendation: Repair cracked/failed brick masonry at garage lintel bearings to ensure structural support. Install through-wall flashing and treat corroded steel lintels.

Sewer Cleanout Cap Replacements

Recommendation: Phase the replacement of failing sewer line cleanout cap assemblies across the property, prioritizing units exhibiting early signs of seal failure or deterioration.

Mid-Range (1 to 2 Years)

Roof-Level Siding Replacement

Recommendation: Remove and replace roof-level siding throughout the project, installing a code-compliant weather-resistive barrier (WRB) and flashing system behind the new siding.

Long-Term Planning (5 to 10 Years)

Amenity Roof Membrane Reserves

Recommendation: Continuously monitor the condition of amenity-level roof membranes and ensure reserve study funding is scheduled for their eventual replacement.

Current Board Action & Status

The Board is actively executing on the engineer's recommendations through several concurrent projects:

  • Phase 3 Defect Repairs: Parapet rebuilding, roof-level Hardie panel siding replacement, and bulkhead door flashings are currently out for contractor bidding with Reconstruction Experts (RE).
  • Site Grading & Drainage: High-level bids are currently being secured from RE to address the immediate grading and drainage corrections required near building foundations.
  • Garage Lintels (Remaining 33 Garages): Remediation of the remaining 33 garage lintel bearings and flashings is being evaluated for inclusion in a subsequent capital phase.
  • Owner Responsibilities: Unit owners are responsible for maintaining their individual roof slope membranes and single-unit downspout scuppers. Affected owners have been notified directly regarding required scupper and membrane maintenance.