Status: Completed — All plumbing was completed on Saturday, April 11. Final concrete restoration was poured on Thursday, April 16.
Originally, this project was initiated to simply address and clean out several sewer cleanouts that were missing their lids. Upon further investigation, it was discovered that the missing brass caps had actually fallen down into the drain pipes.
After multiple unsuccessful attempts to remove the obstructions from the surface, it was determined that the only viable solution was to perform a full replacement by cutting and removing the surrounding concrete to access the pipes directly.
| Expense Category | Amount |
|---|---|
| Sewer Clean Out Rework / Excavation | $7,700.00 |
| Sewer Clean Out Rework / Plumbing | $2,800.00 |
| Materials (Traffic Rated Cleanouts) | $11,396.00 |
| Tax (8.25%) | $940.17 |
| Total | $22,836.17 |
A-1 Affordable Plumbing Services was contracted and successfully executed the heavy civil and plumbing repairs necessary to resolve these obstructions.
This repair targeted specific addresses where the cleanout covers had fallen into the pipes. This impacted 7 double cleanout locations (14 caps total). All work at these locations is now complete: