Project Completion Report

2024 Landscaping Enhancements

Status: Completed (2024)

Overview

The 2024 landscaping project focused on improving the curb appeal and functionality of Units 31–43. This initiative addressed erosion control along the perimeter and unified the aesthetic of the interior grounds.

Work was split between the Bowen Street frontage (Units 31–34) and the interior courtyard units (Units 35–43), tackling specific drainage issues and standardizing plant beds.

Financials

ItemCost
Demo and Bed Prep$13,691.08
Irrigation Reconfiguration$999.13
Subtotal$14,690.21
Sales Tax$1,211.94
Total Investment$15,902.15

Project Area: Units 31 – 43

Financial figures based on specific 2024 invoice records provided.

Scope of Work

The scope was divided into two distinct zones to address the unique needs of the street-facing vs. interior units.

Bowen Street (Units 31–34)

Focused on erosion control and privacy. Bushes were added to the frontage, and river rocks were installed to mitigate soil runoff and manage water flow effectively.

Interior (Units 35–43)

Prioritized uniformity and safety. Ground cover was filled in, and new beds were created to provide a common look. A significant dip in the ground was leveled and sodded to improve usability.